Hammersmith Flyunder Feasibility Report

The first results of the Feasibility Report considering the potential of replacing the Hammersmith A4 Flyover with a Tunnel has been published by the London Borough of Hammersmith and Fulham.The report shows that the Hammersmith Flyunder could be built in three years at a cost of £1.7bn.

“Boris Johnson has said he backs the idea of a “flyunder” and his advisers are believed to have had exploratory talks with council officials. ” – Evening Standard 12th February 2014 Simone de Gale Architects as part of West London Link Design initiated the idea of a replacement tunnel, which gathered interest from the public of which a H&F council poll found that 89 per cent of residents support the idea of a “flyunder” and spurred the commission for the Feasibility Study.

For more on our Hammersmith Flyunder Project the following links are available:

http://westlondonlink.com/ http://www.lbhf.gov.uk/Directory/News/hammersmith_flyunder.asp

http://democracy.lbhf.gov.uk/documents/s46546/final%20select%20committee%20report%20v3.pdf  

From Masterplanning, to Architecture, Interior Design and Concepts, Simone de Gale Architects Will Achieve your Vision.